Elon Energy Tracker

How much power is Elon bringing online?

A live tally of the power supply behind Elon Musk's AI data centers, built from permits, utility filings and reporting. Pick a point in time, then click any part of the chart to see where that power comes from.

-

Power supply at the source (turbines and grid hookups) for SpaceX AI sites. Now: solid = on record as running, light hatched = approved, permitted or announced, not yet shown running. Later dates are our estimates by case, not filed figures; the hatched slice is supply no filing covers yet. Batteries are backup, not supply. Tesla's 225-265 MW is compute load on the grid and is shown under Key numbers. Updated -

Labels permit/filing verified backed by a permit or filing reported credible reporting or an agreed order Elon claim said by Elon, not yet backed up estimate our own math analyst forecast a third party's projection

Key numbers

Does the power exist?

Next 60 days Nov 1, 2026 to Jan 1, 2027

Compute vs power, 2025-2027 MW

Sites

All figures with source type and status

2027-2030 outlook estimate

Dashed line = base case. Shaded band = low to high. Low uses only permitted or energized power. High takes announced plans at face value.

Schedule track record announced vs actual

Where sources disagree

Sources